Projects
Pietro Carnaghi Foundation
Partial Removal of Existing Foundation and Stelcore Piles The project involves the partial removal of the existing foundation. Stelcore piles from the current structure will be removed below the bottom level of the newly proposed foundation block. The machine foundation will be constructed on the demolished portion of the old foundation, ensuring a stable base for the new installation while accommodating the necessary structural adjustments. Careful coordination will be required to ensure proper alignment and support for the new foundation
Concrete forming design service
EXPERTISE
We specialize in design and formwork modeling services, utilizing BIM technology to provide precise material estimates and scheduling.
We have successfully completed numerous challenging and complex projects, ensuring optimal efficiency, safety, and cost-effectiveness.
Become a Customer
Have a Similar Project?
Send us your structural drawings and tell us what formwork you have. We will review the scope and come back with a fixed price and a delivery date.