Projects
Kyle Dam
Two new retaining walls have been incorporated into the existing longitudinal slab structure. The design features a specialized geometry for the proposed walls. Prefabricated flat cross waterstops are strategically placed at the intersections of the transverse slab joint and vertical wall joint for enhanced structural integrity.
GANG Form custom system for construction efficiency
Concrete forming design service
EXPERTISE
We specialize in design and formwork modeling services, utilizing BIM technology to provide precise material estimates and scheduling.
We have successfully completed numerous challenging and complex projects, ensuring optimal efficiency, safety, and cost-effectiveness.
Become a Customer
Have a Similar Project?
Send us your structural drawings and tell us what formwork you have. We will review the scope and come back with a fixed price and a delivery date.